Hello everybody,

We have been working about Trine, Juliet and Anette proposal, and resume our proposal for ICE in ICE09_06_09 pdf file as well we are working in 3d model of ICE, we are making some 3d views that we¨ll upload soon. Anyway when Eduardo and Antonio team finish their work, we can update some views to incorporate their proposal.

About ICE, as we said, we like main ideas of Trine, Juliet and Annete last proposal, we have been working in adjust in some ways public elements, really in dune elements and dune squares.

we have been working about these aims:

1- Permeability North to South, we propose a pedestrian and bicycle route from North to South, connecting School area with Kindergarten area.

2- Adjust Dune elements, reduce slope area and introduce activities in dune squares. We like very much the concept of living street for the main street of Trine, Juliet and Anette proposal, and we think that Dune squares in that proposal were a bit isolated spaces, so we have integrated dune squares in “living street concept” by:
- Reduce slope area , so some shops areas can have facade to streets and to dune squares, so by some shops you can access from the street to dune squares.
- Move some building in order to make more fluid the relation of main street with dune squares.

About building, we are working about them in 3d views, and we have some doubt about the situation of 7/8 storeys buildings, we think it could be more interesting move them or introduce one more as Janne proposed , we haven´t changed them because we don´t know if is possible change it or there is any strong reason for their situation. Anyway we are going to upload dwg file at ftp, for next team (Eduardo /Antonio)

Now, we are making the views, but we think that is possible that Eduardo and Antonio team start to work, and for us it could be very interesting to coordinate in some ways with their team .

Best regards.

Celia and Ramon .
www.realego.es

Click here to download ICE 09-06-09 Pdf file.

ICE 09-06-09 files are in the ftp too

2 Responses to “ICE 09-06-09”

  1. 1
    VK:

    Dear Celia and Raón

    Thank yuo very much for your more detailed plan. It is very fine. Our comments are:

    1. Dunes: OK
    2. Permeability for pedestrians: OK
    3. 7-8 floors buildings at Boulevarden can have another form too, and it could also have a larger building site /footprint in the ground level, so there can be larger shops/offices/public areas too in ground floor, but without spoiling the view to the dunes (difficult task)
    4. Access for cars from the north (kindergarten and transformer) can be difficult, because the property is outside our planning area. Acces from Flegmade as Anette, Julie and Trine have showed can be necessary.
    5. The purple circles as a posibility for small stands is interesting, but we think that there are not enough people to make it possible. (it is not like the Barcelona Rambla). But anything else is possible too, so let them be there - IT information, exhibitions, street art — ??

    all the best regards
    camilla and henrik

  2. 2
    VK:

    Celia and Ramon, you’ve been very fast, thank you! Please don’t forget to upload the dwg file.
    So we’ll work with this file and incorporate Camilla and Henrik’s last comments (and anybody’s, if they come not too late).
    Regards

    Antonio & Eduardo